Requirement Review
Review the drawings, samples, dimensions, aperture, installation details and operating information available for the request.
Supply review
Screen media specifications, drawings, samples, dimensions, apertures, installation details and packing requirements are reviewed before supply.
The review starts with the drawing, sample, dimensions, aperture, installation details and operating information available for the order. Screen Media Works coordinates the confirmed supply scope through to shipment preparation.
Review the drawings, samples, dimensions, aperture, installation details and operating information available for the request.
Confirm the available technical evidence and the quotation basis before the supply scope is finalized.
Coordinate the confirmed product, tooling, quantity and project requirements through the agreed supply path.
Each item is inspected before shipment. Inspection items depend on the product and confirmed order requirements.
Coordinate packing and shipment preparation with the confirmed order and destination requirements.
Replacement review
Replacement suitability is reviewed against the technical information available for the installed deck and the requested screen media format.
| Information | Purpose |
|---|---|
| Existing panel photos | Identify current installation |
| Dimensions | Confirm replacement size |
| Opening requirements | Review screening requirements |
| Fixing method | Check installation compatibility |
| Machine information | Understand application context |
Use the Screen Panel Replacement Guide when preparing a replacement request. After reviewing the available deck and duty information, compare Polyurethane Screen Panels. Flexible applications may require Flip Flow Screen Panels, while water-removal duties may call for Dewatering Screen Panels.
Review duty context through aggregate screening applications and sand washing and dewatering applications before confirming the requested scope.
Evidence on request
Applicable mechanical test reports, production or factory videos and samples are available for review on request. ISO 9001 certification documentation is available for review on request.
Reports and visual evidence depend on the product and confirmed order requirements. Samples can be provided for specification or fit confirmation where applicable.
Quotations are generally issued within 24 hours after sufficient technical information is received. Complex drawing-based parts may require additional technical review time.
Factory & OfficeBuilding D1, Zhongyi 1688 Industrial Park, No. 1022 Beilao Road, Licang District, Qingdao, Shandong, China
